Skip to content
// Hardware Supply

Sourcing GPUs, servers, networking, and power equipment through authorized channels.

// QUICK ANSWER

Group APZ sources both in-rack and out-of-rack HPC assets — from individual GPUs and servers to networking and behind-the-meter power generation equipment. All work is done through authorized channels and direct allocations, with transparent pricing, validated lead times, and frictionless logistics into North American data centers.

// 01Approach

How we approach hardware supply

We sit between hyperscale-grade demand and the global HPC supply base. Our team negotiates allocation on current-generation NVIDIA and AMD accelerators, scopes the full cluster bill of materials — servers, fabric, storage, racks, optics, and power — validates SKUs and firmware, secures freight and customs, and protects clients from grey-market exposure. Whether you need a single rack of H200s or a multi-megawatt GB200 NVL72 cluster, we structure the buy so the equipment arrives on the date the facility is ready for it.

// 02Outcomes

01Confirmed allocation on current-generation NVIDIA and AMD accelerators
02Per-SKU price benchmarks against authorized-channel and direct OEM quotes
03Validated power, cooling, weight, and rack-fit before PO
04Clean chain of custody, warranty registration, and serial-level reporting

// 03Deliverables

01Sourcing strategy and full cluster BOM by SKU, quantity, and required-on-site date
02Multi-vendor RFQ across distributors, integrators, and direct OEM with normalized scoring
03Master Purchase Agreement review and term negotiation support
04Logistics coordination: freight, insurance, customs, staging, and dock scheduling
// 04Questions

Yes. We work directly with authorized channel partners and OEMs to secure allocation on current-generation NVIDIA accelerators including H200, B200, and GB200 NVL72 systems. Lead times and pricing are confirmed in writing before any commitment.

// 05Related